SERVICES

BIM Model Coordination 

Shop Drawing Submission via BIM

fcb stadium logo
fcb stadium colorful logo

LOCATION

Barcelona, Spain

CONSTRUCTION YEAR

2023- Ongoing

PROJECT AREA

295.000 m²

DESIGN

nikken sekkei logo
b720 logo

BIM MANAGER

idom logo
Ghesa logo

 EMPRESARIORS AGRUPADOS

el-futuro-estadio-camp-nou-de-barcelona-recibe-el-premio-internacional-de-arquitectura-iaa

NEW CAMP NOU

SFMM involved as design subcontractor for the project under the supervision of Spain based design management subcontractor GHESA. As a team, LOD level of the models are being upgraded in coordination with the other disciplines, in meantime shop drawings for architectural packages are being produced from coordinated BIM models for execution on site. 

As platform Autodesk Construction Cloud is fully utilized for modelling, drafting and document management. 